31.12.2018



31.12.2018
0
comments

Work at the Zmiivska TPP on technical re-equipment of supply systems for the preparation and combustion of A and P grades with the conversion of the boiler units of station blocks 1 and 6 to the use of G and DG grade coal was completed.

Leave a Reply