Work at the Zmiivska TPP on technical re-equipment of supply systems for the preparation and combustion of A and P grades with the conversion of the boiler units of station blocks 1 and 6 to the use of G and DG grade coal was completed.
31.12.2018
Categories:
Leave a Reply