Start of work at Unit 5 of the Zaporizhzhya NPP to replace the excitation system of the TVB-1000 turbogenerator.
18.08.2019
Categories:
Leave a Reply
Start of work at Unit 5 of the Zaporizhzhya NPP to replace the excitation system of the TVB-1000 turbogenerator.